Round 1 · simulation 20 · cycle-002.e4-bgd

Round 1997

Round 1 of 30 in simulation 20 of Bangladesh, scripted, 30 years from 1996: 5 actions, and the index +0.007 to 6.47.

Model 0.1.0 · graph 0.2.0 · parameters 0.1.0

State in and state out

The simulation as it came into 1997 (the end of 1996) and as it left it.

Capability index
6.47 (+0.007)
In: 6.47
Rank by index
90
In: 90
Domains at Tier 1
0
In: 0
Credits carried
0
In: 0
Each domain's mean score and tier coming in and going out
DomainInOutChangeTier
Critical Technology2.672.670.00012
Strategic Infrastructure6.836.84+0.0099
National Security4.844.840.0008
Human Capital7.257.27+0.01813
Information & Influence6.656.650.00011
Governance & Integrity7.787.780.00016
Financial Strength7.837.830.00020
Production & Innovation6.906.900.00016
Trade & Investment7.457.49+0.03213

Decision, shocks and propagation

What happened in 1997: the credits, the scripted method's decision and its actions, any shocks and upside events, the tier changes, and the groups that moved most, split into what was invested, lost to decay, struck by events and carried through the dependency graph.

Credits. Income 123. Maintenance 96. Spent 27 on actions (build 27). 0 carried over.

  • BuildAgriculture & Food Infrastructure6 credits for 0.26 levelsscripted_history
  • BuildExport Capability & Sophistication6 credits for 0.45 levelsscripted_history
  • BuildFoundational Education6 credits for 0.44 levelsscripted_history
  • BuildPopulation Health6 credits for 0.38 levelsscripted_history
  • BuildWater, Sanitation & Waste Infrastructure2 credits for 0.10 levelsscripted_history
The groups that moved most in 1997, and what moved them
Moved mostChangeInvestedDecayEventsGraph
Export Capability & Sophistication+0.22+0.220.000.000.00
Foundational Education+0.09+0.090.000.000.00
Population Health+0.07+0.070.000.000.00
Agriculture & Food Infrastructure+0.07+0.070.000.000.00
Water, Sanitation & Waste Infrastructure+0.02+0.020.000.000.00