Round 14 · simulation 28 · cycle-003.e4-bwa

Round 2010

Round 14 of 30 in simulation 28 of Botswana, scripted, 30 years from 1996: 3 actions, and the index +0.028 to 9.22.

Model 0.2.0 · graph 0.2.0 · parameters 0.1.1

State in and state out

The simulation as it came into 2010 (the end of 2009) and as it left it.

Capability index
9.22 (+0.029)
In: 9.19
Rank by index
56
In: 56
Domains at Tier 1
0
In: 0
Credits carried
296
In: 239
Each domain's mean score and tier coming in and going out
DomainInOutChangeTier
Critical Technology2.652.650.00012
Strategic Infrastructure11.1411.25+0.1084
National Security5.925.92−0.0027
Human Capital10.7810.80+0.0234
Information & Influence8.148.14−0.0068
Governance & Integrity13.8113.82+0.0084
Financial Strength11.9411.94−0.00611
Production & Innovation9.039.08+0.04712
Trade & Investment9.339.41+0.08310

Decision, shocks and propagation

What happened in 2010: the credits, the scripted method's decision and its actions, any shocks and upside events, the tier changes, and the groups that moved most, split into what was invested, lost to decay, struck by events and carried through the dependency graph.

Credits. Income 255, plus 239 carried in. Maintenance 182. Spent 15 on actions (partner 15). 296 carried over.

  • PartnerStructural Transformation & Complexity5 credits for 0.33 levelsscripted_history
  • PartnerGlobal Value Chain Position5 credits for 0.51 levelsscripted_history
  • PartnerAdvanced Manufacturing5 credits for 0.29 levelsscripted_history
The groups that moved most in 2010, and what moved them
Moved mostChangeInvestedDecayEventsGraph
Global Value Chain Position+0.53+0.530.000.000.00
Advanced Manufacturing+0.34+0.300.000.00+0.04
Structural Transformation & Complexity+0.34+0.340.000.000.00
Water, Sanitation & Waste Infrastructure+0.26+0.260.000.000.00
Energy Infrastructure+0.24+0.250.000.00−0.01
Transport Infrastructure+0.24+0.250.000.00−0.01