Round 14 · simulation 9 · cycle-003.e4-bwa

Round 2010

Round 14 of 30 in simulation 9 of Botswana, scripted, 30 years from 1996: 3 actions, and the index +0.030 to 9.23.

Model 0.2.0 · graph 0.2.0 · parameters 0.1.1

State in and state out

The simulation as it came into 2010 (the end of 2009) and as it left it.

Capability index
9.23 (+0.030)
In: 9.20
Rank by index
56
In: 56
Domains at Tier 1
0
In: 0
Credits carried
297
In: 239
Each domain's mean score and tier coming in and going out
DomainInOutChangeTier
Critical Technology2.662.660.00012
Strategic Infrastructure11.1511.26+0.1104
National Security5.935.930.0007
Human Capital10.7810.80+0.0244
Information & Influence8.148.14−0.0048
Governance & Integrity13.8013.81+0.0094
Financial Strength11.9611.96−0.00511
Production & Innovation9.069.11+0.05312
Trade & Investment9.359.44+0.08510

Decision, shocks and propagation

What happened in 2010: the credits, the scripted method's decision and its actions, any shocks and upside events, the tier changes, and the groups that moved most, split into what was invested, lost to decay, struck by events and carried through the dependency graph.

Credits. Income 255, plus 239 carried in. Maintenance 182. Spent 15 on actions (partner 15). 297 carried over.

  • PartnerStructural Transformation & Complexity5 credits for 0.33 levelsscripted_history
  • PartnerGlobal Value Chain Position5 credits for 0.51 levelsscripted_history
  • PartnerAdvanced Manufacturing5 credits for 0.29 levelsscripted_history
The groups that moved most in 2010, and what moved them
Moved mostChangeInvestedDecayEventsGraph
Global Value Chain Position+0.53+0.530.000.000.00
Advanced Manufacturing+0.35+0.300.000.00+0.05
Structural Transformation & Complexity+0.34+0.340.000.00−0.01
Water, Sanitation & Waste Infrastructure+0.25+0.260.000.00−0.01
Energy Infrastructure+0.24+0.250.000.00−0.01
Transport Infrastructure+0.24+0.250.000.00−0.01