Round 2009
Round 13 of 30 in simulation 2 of Italy, scripted, 30 years from 1996: 0 actions, Core disaster, and the index −0.124 to 14.80.
Model 0.2.0 · graph 0.2.0 · parameters 0.1.1
State in and state out
The simulation as it came into 2009 (the end of 2008) and as it left it.
- Capability index
- 14.80 (−0.125)
- In: 14.93
- Rank by index
- 13
- In: 13
- Domains at Tier 1
- 3
- In: 3
- Credits carried
- 0
- In: 0
| Domain | In | Out | Change | Tier |
|---|---|---|---|---|
| Critical Technology | 13.02 | 13.01 | −0.003 | 4 |
| Strategic Infrastructure | 16.41 | 16.22 | −0.186 | 1 |
| National Security | 14.33 | 14.26 | −0.070 | 2 |
| Human Capital | 14.77 | 14.67 | −0.095 | 3 |
| Information & Influence | 15.34 | 15.25 | −0.084 | 2 |
| Governance & Integrity | 13.80 | 13.71 | −0.089 | 1 |
| Financial Strength | 16.55 | 16.34 | −0.211 | 1 |
| Production & Innovation | 14.83 | 14.65 | −0.175 | 3 |
| Trade & Investment | 15.32 | 15.12 | −0.205 | 3 |
Decision, shocks and propagation
What happened in 2009: the credits, the scripted method's decision and its actions, any shocks and upside events, the tier changes, and the groups that moved most, split into what was invested, lost to decay, struck by events and carried through the dependency graph.
Credits. Income 828. Maintenance 828. Nothing spent on actions. 0 carried over. 8 actions could not be paid for.
- Shock: Core disaster S07. −9.1 points across the groups it bears on, after exposure, absorption and vulnerability, spread over its duration.
| Moved most | Change | Invested | Decay | Events | Graph |
|---|---|---|---|---|---|
| Fiscal Capacity & Public Finance | −0.31 | 0.00 | 0.00 | −0.27 | −0.04 |
| Energy Infrastructure | −0.30 | 0.00 | 0.00 | −0.30 | 0.00 |
| Industrial & Sectoral Base | −0.27 | 0.00 | 0.00 | −0.30 | +0.03 |
| Financial System Depth & Access | −0.27 | 0.00 | 0.00 | −0.27 | 0.00 |
| Trade Facilitation & Logistics | −0.26 | 0.00 | 0.00 | −0.38 | +0.11 |
| Water, Sanitation & Waste Infrastructure | −0.25 | 0.00 | 0.00 | −0.30 | +0.05 |