Round 18 · simulation 28 · cycle-002.e4-rwa

Round 2014

Round 18 of 30 in simulation 28 of Rwanda, scripted, 30 years from 1996: 5 actions, and the index +0.008 to 4.33.

Model 0.1.0 · graph 0.2.0 · parameters 0.1.0

State in and state out

The simulation as it came into 2014 (the end of 2013) and as it left it.

Capability index
4.33 (+0.008)
In: 4.32
Rank by index
135
In: 135
Domains at Tier 1
0
In: 0
Credits carried
39
In: 46
Each domain's mean score and tier coming in and going out
DomainInOutChangeTier
Critical Technology1.581.60+0.01912
Strategic Infrastructure4.914.92+0.01210
National Security3.153.14−0.0029
Human Capital6.006.01+0.01214
Information & Influence4.574.56−0.00314
Governance & Integrity5.645.65+0.00719
Financial Strength4.714.710.00030
Production & Innovation4.134.16+0.02721
Trade & Investment4.224.22+0.00119

Decision, shocks and propagation

What happened in 2014: the credits, the scripted method's decision and its actions, any shocks and upside events, the tier changes, and the groups that moved most, split into what was invested, lost to decay, struck by events and carried through the dependency graph.

Credits. Income 67, plus 46 carried in. Maintenance 57. Spent 17 on actions (build 17). 39 carried over.

  • BuildConnectivity, Cyber & Trust Technologies3 credits for 0.29 levelsscripted_history
  • BuildDigital & AI Competence3 credits for 0.35 levelsscripted_history
  • BuildTechnology Adoption & Diffusion3 credits for 0.27 levelsscripted_history
  • BuildPublic Integrity & Anti-Corruption3 credits for 0.20 levelsscripted_history
  • BuildAgriculture & Food Infrastructure3 credits for 0.15 levelsscripted_history
The groups that moved most in 2014, and what moved them
Moved mostChangeInvestedDecayEventsGraph
Connectivity, Cyber & Trust Technologies+0.19+0.200.000.000.00
Technology Adoption & Diffusion+0.18+0.180.000.000.00
Digital & AI Competence+0.14+0.140.000.000.00
Agriculture & Food Infrastructure+0.08+0.080.000.000.00
Public Integrity & Anti-Corruption+0.07+0.080.000.00−0.01
Transport Infrastructure+0.03+0.030.000.000.00