Round 14 · simulation 14 · cycle-003.e4-chl

Round 2010

Round 14 of 30 in simulation 14 of Chile, scripted, 30 years from 1996: 4 actions, Core disaster, and the index −0.346 to 10.11.

Model 0.2.0 · graph 0.2.0 · parameters 0.1.1

State in and state out

The simulation as it came into 2010 (the end of 2009) and as it left it.

Capability index
10.11 (−0.345)
In: 10.45
Rank by index
45
In: 44
Domains at Tier 1
1
In: 1
Credits carried
183
In: 181
Each domain's mean score and tier coming in and going out
DomainInOutChangeTier
Critical Technology4.154.13−0.01110
Strategic Infrastructure12.2411.71−0.5344
National Security7.797.59−0.2017
Human Capital12.3012.18−0.1214
Information & Influence8.738.51−0.2257
Governance & Integrity13.0712.76−0.3125
Financial Strength13.4912.97−0.5236
Production & Innovation10.229.68−0.5399 → 11
Trade & Investment12.0511.41−0.6451

Decision, shocks and propagation

What happened in 2010: the credits, the scripted method's decision and its actions, any shocks and upside events, the tier changes, and the groups that moved most, split into what was invested, lost to decay, struck by events and carried through the dependency graph.

Credits. Income 328, plus 181 carried in. Maintenance 261. Spent 65 on actions (build 65). 183 carried over.

  • BuildAdvanced Education16 credits for 0.96 levelsscripted_history
  • BuildEnergy Infrastructure16 credits for 0.65 levelsscripted_history
  • BuildEarly Childhood Development16 credits for 0.89 levelsscripted_history
  • BuildFinancial System Depth & Access16 credits for 0.61 levelsscripted_history
  • Shock: Core disaster S07. −27.1 points across the groups it bears on, after exposure, absorption and vulnerability, spread over its duration.

Tiers. Production & Innovation Tier 9 to 11.

The groups that moved most in 2010, and what moved them
Moved mostChangeInvestedDecayEventsGraph
Trade Facilitation & Logistics−1.140.000.00−1.13−0.01
Fiscal Capacity & Public Finance−0.970.000.00−0.95−0.02
Industrial & Sectoral Base−0.940.000.00−0.96+0.02
Social Infrastructure−0.930.000.00−0.91−0.02
Water, Sanitation & Waste Infrastructure−0.910.000.00−0.90−0.01
Transport Infrastructure−0.830.000.00−0.82−0.01