Round 15 · simulation 7 · cycle-003.e4-kaz

Round 2011

Round 15 of 30 in simulation 7 of Kazakhstan, scripted, 30 years from 1996: 5 actions, and the index +0.015 to 7.66.

Model 0.2.0 · graph 0.2.0 · parameters 0.1.1

State in and state out

The simulation as it came into 2011 (the end of 2010) and as it left it.

Capability index
7.66 (+0.014)
In: 7.65
Rank by index
71
In: 71
Domains at Tier 1
0
In: 0
Credits carried
236
In: 203
Each domain's mean score and tier coming in and going out
DomainInOutChangeTier
Critical Technology4.114.110.0009
Strategic Infrastructure10.4710.49+0.0194
National Security6.016.00−0.0026
Human Capital9.509.50+0.00310
Information & Influence6.936.93−0.00210
Governance & Integrity7.347.34−0.00216
Financial Strength8.798.78−0.00116
Production & Innovation7.337.39+0.06915
Trade & Investment8.378.42+0.0459

Decision, shocks and propagation

What happened in 2011: the credits, the scripted method's decision and its actions, any shocks and upside events, the tier changes, and the groups that moved most, split into what was invested, lost to decay, struck by events and carried through the dependency graph.

Credits. Income 204, plus 203 carried in. Maintenance 151. Spent 20 on actions (build 20). 236 carried over.

  • BuildIndustrial & Sectoral Base4 credits for 0.24 levelsscripted_history
  • BuildAdvanced Manufacturing4 credits for 0.16 levelsscripted_history
  • BuildTrade Policy & Market Access4 credits for 0.27 levelsscripted_history
  • BuildStructural Transformation & Complexity4 credits for 0.25 levelsscripted_history
  • BuildTransport Infrastructure4 credits for 0.16 levelsscripted_history
The groups that moved most in 2011, and what moved them
Moved mostChangeInvestedDecayEventsGraph
Trade Policy & Market Access+0.28+0.280.000.000.00
Structural Transformation & Complexity+0.25+0.250.000.000.00
Industrial & Sectoral Base+0.24+0.240.000.000.00
Advanced Manufacturing+0.16+0.170.000.00−0.01
Transport Infrastructure+0.14+0.160.000.00−0.03
Social Infrastructure−0.030.000.000.00−0.03