Round 27 · simulation 22 · cycle-003.e4-rwa

Round 2023

Round 27 of 30 in simulation 22 of Rwanda, scripted, 30 years from 1996: 5 actions, and the index +0.001 to 4.54.

Model 0.2.0 · graph 0.2.0 · parameters 0.1.1

State in and state out

The simulation as it came into 2023 (the end of 2022) and as it left it.

Capability index
4.54 (+0.001)
In: 4.54
Rank by index
130
In: 130
Domains at Tier 1
0
In: 0
Credits carried
78
In: 72
Each domain's mean score and tier coming in and going out
DomainInOutChangeTier
Critical Technology2.052.05−0.00112
Strategic Infrastructure5.295.31+0.01810
National Security3.483.48−0.0018
Human Capital6.066.07+0.00913
Information & Influence4.434.42−0.00414
Governance & Integrity5.735.73−0.00418
Financial Strength4.764.75−0.01329
Production & Innovation4.614.63+0.01519
Trade & Investment4.454.44−0.00817

Decision, shocks and propagation

What happened in 2023: the credits, the scripted method's decision and its actions, any shocks and upside events, the tier changes, and the groups that moved most, split into what was invested, lost to decay, struck by events and carried through the dependency graph.

Credits. Income 85, plus 72 carried in. Maintenance 70. Spent 9 on actions (build 9). 78 carried over.

  • BuildEnergy Infrastructure2 credits for 0.09 levelsscripted_history
  • BuildTransport Infrastructure2 credits for 0.08 levelsscripted_history
  • BuildAdvanced Manufacturing2 credits for 0.08 levelsscripted_history
  • BuildIndustrial & Sectoral Base2 credits for 0.12 levelsscripted_history
  • BuildHealth System Capability2 credits for 0.09 levelsscripted_history
The groups that moved most in 2023, and what moved them
Moved mostChangeInvestedDecayEventsGraph
Industrial & Sectoral Base+0.12+0.120.000.00+0.01
Energy Infrastructure+0.09+0.090.000.000.00
Health System Capability+0.08+0.090.000.00−0.01
Advanced Manufacturing+0.08+0.080.000.000.00
Transport Infrastructure+0.07+0.080.000.00−0.02
Fiscal Capacity & Public Finance−0.030.000.000.00−0.03