Round 2024
Round 28 of 30 in simulation 26 of Vietnam, scripted, 30 years from 1996: 3 actions, Core disaster, and the index −0.190 to 8.00.
Model 0.2.0 · graph 0.2.0 · parameters 0.1.1
State in and state out
The simulation as it came into 2024 (the end of 2023) and as it left it.
- Capability index
- 8.00 (−0.189)
- In: 8.19
- Rank by index
- 68
- In: 64
- Domains at Tier 1
- 0
- In: 0
- Credits carried
- 0
- In: 0
| Domain | In | Out | Change | Tier |
|---|---|---|---|---|
| Critical Technology | 3.75 | 3.80 | +0.052 | 10 |
| Strategic Infrastructure | 9.29 | 8.93 | −0.358 | 5 → 6 |
| National Security | 6.67 | 6.57 | −0.103 | 7 |
| Human Capital | 9.81 | 9.65 | −0.164 | 9 |
| Information & Influence | 7.33 | 7.22 | −0.114 | 9 |
| Governance & Integrity | 8.64 | 8.51 | −0.131 | 13 |
| Financial Strength | 7.72 | 7.41 | −0.308 | 19 → 20 |
| Production & Innovation | 8.82 | 8.60 | −0.219 | 11 → 10 |
| Trade & Investment | 11.66 | 11.30 | −0.361 | 5 |
Decision, shocks and propagation
What happened in 2024: the credits, the scripted method's decision and its actions, any shocks and upside events, the tier changes, and the groups that moved most, split into what was invested, lost to decay, struck by events and carried through the dependency graph.
Credits. Income 194. Maintenance 166. Spent 29 on actions (build 29). 0 carried over. 2 actions could not be paid for.
- BuildEnergy Technologies10 credits for 0.62 levelsscripted_history
- BuildSemiconductors & Advanced Computing10 credits for 0.44 levelsscripted_history
- BuildArtificial Intelligence10 credits for 0.55 levelsscripted_history
- Shock: Core disaster S07. −14.8 points across the groups it bears on, after exposure, absorption and vulnerability, spread over its duration.
Tiers. Strategic Infrastructure Tier 5 to 6; Financial Strength Tier 19 to 20; Production & Innovation Tier 11 to 10.
| Moved most | Change | Invested | Decay | Events | Graph |
|---|---|---|---|---|---|
| Trade Facilitation & Logistics | −0.61 | 0.00 | 0.00 | −0.60 | −0.01 |
| Social Infrastructure | −0.59 | 0.00 | 0.00 | −0.55 | −0.05 |
| Industrial & Sectoral Base | −0.59 | 0.00 | 0.00 | −0.58 | −0.01 |
| Transport Infrastructure | −0.54 | 0.00 | 0.00 | −0.52 | −0.01 |
| Fiscal Capacity & Public Finance | −0.50 | 0.00 | 0.00 | −0.50 | 0.00 |
| Energy Infrastructure | −0.48 | 0.00 | 0.00 | −0.47 | −0.01 |