Round 10 · simulation 2 · cycle-003.e4-zaf

Round 2006

Round 10 of 30 in simulation 2 of South Africa, scripted, 30 years from 1996: 4 actions, and the index +0.044 to 12.17.

Model 0.2.0 · graph 0.2.0 · parameters 0.1.1

State in and state out

The simulation as it came into 2006 (the end of 2005) and as it left it.

Capability index
12.17 (+0.044)
In: 12.13
Rank by index
28
In: 28
Domains at Tier 1
1
In: 1
Credits carried
540
In: 516
Each domain's mean score and tier coming in and going out
DomainInOutChangeTier
Critical Technology7.987.98+0.0026
Strategic Infrastructure13.5913.74+0.1512
National Security9.579.58+0.0064
Human Capital11.3811.50+0.1246
Information & Influence12.0412.04+0.0025
Governance & Integrity12.9913.00+0.0047
Financial Strength16.1816.18+0.0021
Production & Innovation11.9312.03+0.1036
Trade & Investment13.4913.50+0.0042

Decision, shocks and propagation

What happened in 2006: the credits, the scripted method's decision and its actions, any shocks and upside events, the tier changes, and the groups that moved most, split into what was invested, lost to decay, struck by events and carried through the dependency graph.

Credits. Income 464, plus 516 carried in. Maintenance 347. Spent 93 on actions (build 93). 540 carried over.

  • BuildEnergy Infrastructure23 credits for 0.80 levelsscripted_history
  • BuildTransport Infrastructure23 credits for 0.83 levelsscripted_history
  • BuildCommunications & Digital Infrastructure23 credits for 1.07 levelsscripted_history
  • BuildIndustrial & Sectoral Base23 credits for 1.01 levelsscripted_history
The groups that moved most in 2006, and what moved them
Moved mostChangeInvestedDecayEventsGraph
Industrial & Sectoral Base+0.69+0.680.000.00+0.01
Communications & Digital Infrastructure+0.54+0.540.000.000.00
Transport Infrastructure+0.44+0.420.000.00+0.03
Energy Infrastructure+0.41+0.400.000.00+0.01
Foundational Education+0.41+0.400.000.00+0.01
Population Health+0.35+0.340.000.00+0.01