Round 14 · simulation 2 · cycle-002.e4-bwa

Round 2010

Round 14 of 30 in simulation 2 of Botswana, scripted, 30 years from 1996: 3 actions, and the index +0.023 to 8.99.

Model 0.1.0 · graph 0.2.0 · parameters 0.1.0

State in and state out

The simulation as it came into 2010 (the end of 2009) and as it left it.

Capability index
8.99 (+0.023)
In: 8.97
Rank by index
57
In: 58
Domains at Tier 1
0
In: 0
Credits carried
265
In: 215
Each domain's mean score and tier coming in and going out
DomainInOutChangeTier
Critical Technology1.841.84−0.00613
Strategic Infrastructure10.8410.94+0.0944
National Security5.735.73−0.0018
Human Capital10.5210.53+0.0185
Information & Influence7.997.99−0.0068
Governance & Integrity13.7213.72+0.0044
Financial Strength11.9411.93−0.00611
Production & Innovation8.928.96+0.04012
Trade & Investment9.239.30+0.07010

Decision, shocks and propagation

What happened in 2010: the credits, the scripted method's decision and its actions, any shocks and upside events, the tier changes, and the groups that moved most, split into what was invested, lost to decay, struck by events and carried through the dependency graph.

Credits. Income 217, plus 215 carried in. Maintenance 154. Spent 13 on actions (partner 13). 265 carried over.

  • PartnerStructural Transformation & Complexity4 credits for 0.29 levelsscripted_history
  • PartnerGlobal Value Chain Position4 credits for 0.44 levelsscripted_history
  • PartnerAdvanced Manufacturing4 credits for 0.25 levelsscripted_history
The groups that moved most in 2010, and what moved them
Moved mostChangeInvestedDecayEventsGraph
Global Value Chain Position+0.46+0.460.000.000.00
Structural Transformation & Complexity+0.29+0.300.000.000.00
Advanced Manufacturing+0.29+0.260.000.00+0.02
Water, Sanitation & Waste Infrastructure+0.22+0.230.000.00−0.01
Energy Infrastructure+0.22+0.220.000.00−0.01
Transport Infrastructure+0.21+0.220.000.00−0.01