Simulations
All 30 simulations of Mexico, scripted, 30 years from 1996, one per seed, at 2026. The representative simulations link to their own pages, told round by round.
Model 0.2.0 · graph 0.2.0 · parameters 0.1.1 · The experiment
Every simulation
One row per seed, at the horizon. Select a heading to sort.
Simulation | Index | Change | Rank | Tier rank | Tier 1 | Shocks | Upsides | Most funded group |
|---|---|---|---|---|---|---|---|---|
| 18 | 8.60 | −1.06 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |
| 9 | 8.60 | −1.07 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |
| 23 | 8.60 | −1.07 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |
| 17A good simulation (90th percentile) | 8.60 | −1.07 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |
| 22 | 8.60 | −1.07 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |
| 30 | 8.60 | −1.07 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |
| 5 | 8.60 | −1.07 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |
| 27 | 8.60 | −1.07 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |
| 7 | 8.60 | −1.07 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |
| 20 | 8.60 | −1.07 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |
| 11 | 8.60 | −1.07 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |
| 13 | 8.60 | −1.07 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |
| 26 | 8.60 | −1.07 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |
| 14 | 8.59 | −1.07 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |
| 16Median simulation | 8.59 | −1.07 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |
| 1 | 8.59 | −1.07 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |
| 3 | 8.59 | −1.07 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |
| 8 | 8.59 | −1.07 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |
| 12 | 8.59 | −1.07 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |
| 21 | 8.59 | −1.07 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |
| 24 | 8.59 | −1.08 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |
| 4 | 8.59 | −1.08 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |
| 29 | 8.59 | −1.08 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |
| 6 | 8.59 | −1.08 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |
| 10 | 8.59 | −1.08 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |
| 19 | 8.59 | −1.08 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |
| 25A poor simulation (10th percentile) | 8.58 | −1.08 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |
| 2 | 8.58 | −1.08 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |
| 28 | 8.58 | −1.09 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |
| 15 | 8.57 | −1.09 | 62 | 34 | 0 | 7 | 0 | Energy Infrastructure (14 per cent) |