Simulations
All 30 simulations of Brazil, scripted, 30 years from 1996, one per seed, at 2026. The representative simulations link to their own pages, told round by round.
Model 0.1.0 · graph 0.2.0 · parameters 0.1.0 · The experiment
Every simulation
One row per seed, at the horizon. Select a heading to sort.
Simulation | Index | Change | Rank | Tier rank | Tier 1 | Shocks | Upsides | Most funded group |
|---|---|---|---|---|---|---|---|---|
| 19 | 11.81 | +0.38 | 30 | 5 | 3 | 4 | 0 | Energy Infrastructure (9 per cent) |
| 13 | 11.80 | +0.38 | 30 | 5 | 3 | 4 | 0 | Energy Infrastructure (9 per cent) |
| 7 | 11.80 | +0.37 | 30 | 5 | 3 | 4 | 0 | Energy Infrastructure (9 per cent) |
| 9A good simulation (90th percentile) | 11.79 | +0.37 | 30 | 5 | 3 | 4 | 0 | Energy Infrastructure (9 per cent) |
| 8 | 11.79 | +0.36 | 30 | 5 | 3 | 4 | 0 | Energy Infrastructure (9 per cent) |
| 17 | 11.79 | +0.36 | 30 | 5 | 3 | 4 | 0 | Energy Infrastructure (9 per cent) |
| 15 | 11.79 | +0.36 | 30 | 5 | 3 | 4 | 0 | Energy Infrastructure (9 per cent) |
| 23 | 11.79 | +0.36 | 30 | 5 | 3 | 4 | 0 | Energy Infrastructure (9 per cent) |
| 11 | 11.79 | +0.36 | 30 | 5 | 3 | 4 | 0 | Energy Infrastructure (9 per cent) |
| 14 | 11.79 | +0.36 | 30 | 5 | 3 | 4 | 0 | Energy Infrastructure (9 per cent) |
| 3 | 11.78 | +0.36 | 30 | 5 | 3 | 4 | 0 | Energy Infrastructure (9 per cent) |
| 5 | 11.78 | +0.36 | 30 | 5 | 3 | 4 | 0 | Energy Infrastructure (9 per cent) |
| 6 | 11.78 | +0.36 | 30 | 5 | 3 | 4 | 0 | Energy Infrastructure (9 per cent) |
| 29 | 11.78 | +0.36 | 30 | 5 | 3 | 4 | 0 | Energy Infrastructure (9 per cent) |
| 4Median simulation | 11.78 | +0.36 | 30 | 5 | 3 | 4 | 0 | Energy Infrastructure (9 per cent) |
| 28 | 11.78 | +0.35 | 30 | 5 | 3 | 4 | 0 | Energy Infrastructure (9 per cent) |
| 26 | 11.78 | +0.35 | 30 | 5 | 3 | 4 | 0 | Energy Infrastructure (9 per cent) |
| 10 | 11.78 | +0.35 | 30 | 5 | 3 | 4 | 0 | Energy Infrastructure (9 per cent) |
| 12 | 11.78 | +0.35 | 30 | 5 | 3 | 4 | 0 | Energy Infrastructure (9 per cent) |
| 27 | 11.78 | +0.35 | 30 | 5 | 3 | 4 | 0 | Energy Infrastructure (9 per cent) |
| 24 | 11.78 | +0.35 | 30 | 5 | 3 | 4 | 0 | Energy Infrastructure (9 per cent) |
| 30 | 11.78 | +0.35 | 30 | 5 | 3 | 4 | 0 | Energy Infrastructure (9 per cent) |
| 1 | 11.78 | +0.35 | 30 | 5 | 3 | 4 | 0 | Energy Infrastructure (9 per cent) |
| 20 | 11.78 | +0.35 | 30 | 5 | 3 | 4 | 0 | Energy Infrastructure (9 per cent) |
| 25 | 11.78 | +0.35 | 30 | 9 | 2 | 4 | 0 | Energy Infrastructure (9 per cent) |
| 21 | 11.77 | +0.34 | 30 | 5 | 3 | 4 | 0 | Energy Infrastructure (9 per cent) |
| 22A poor simulation (10th percentile) | 11.77 | +0.34 | 30 | 5 | 3 | 4 | 0 | Energy Infrastructure (9 per cent) |
| 2 | 11.77 | +0.34 | 30 | 5 | 3 | 4 | 0 | Energy Infrastructure (9 per cent) |
| 16 | 11.77 | +0.34 | 30 | 5 | 3 | 4 | 0 | Energy Infrastructure (9 per cent) |
| 18 | 11.76 | +0.33 | 30 | 5 | 3 | 4 | 0 | Energy Infrastructure (9 per cent) |