E4 · cycle-002.e4-eth

Simulations

All 30 simulations of Ethiopia, scripted, 30 years from 1996, one per seed, at 2026. The representative simulations link to their own pages, told round by round.

Model 0.1.0 · graph 0.2.0 · parameters 0.1.0 · The experiment

Every simulation

One row per seed, at the horizon. Select a heading to sort.

Simulation
Index
Change
Rank
Tier rank
Tier 1
Shocks
Upsides
Most funded group
261.77−4.19192176072Transport Infrastructure (12 per cent)
51.77−4.19192183072Transport Infrastructure (12 per cent)
271.77−4.19192184072Transport Infrastructure (12 per cent)
11A good simulation (90th percentile)1.77−4.19192180072Transport Infrastructure (12 per cent)
31.76−4.20192184072Transport Infrastructure (12 per cent)
171.76−4.20192184072Transport Infrastructure (12 per cent)
301.76−4.20192184072Transport Infrastructure (12 per cent)
181.76−4.20192183072Transport Infrastructure (12 per cent)
131.76−4.20192177072Transport Infrastructure (12 per cent)
81.76−4.20192180072Transport Infrastructure (12 per cent)
91.75−4.21192184072Transport Infrastructure (12 per cent)
221.75−4.21192177072Transport Infrastructure (12 per cent)
61.75−4.21192180072Transport Infrastructure (12 per cent)
161.75−4.21192183072Transport Infrastructure (12 per cent)
21.75−4.21192177072Transport Infrastructure (12 per cent)
21Median simulation1.74−4.22192177072Transport Infrastructure (12 per cent)
11.74−4.22192180072Transport Infrastructure (12 per cent)
71.74−4.22192180072Transport Infrastructure (12 per cent)
201.74−4.22192184072Transport Infrastructure (12 per cent)
231.74−4.22192184072Transport Infrastructure (12 per cent)
141.74−4.22192180072Transport Infrastructure (12 per cent)
41.74−4.22192180072Transport Infrastructure (12 per cent)
101.73−4.23192177072Transport Infrastructure (12 per cent)
191.73−4.23192184072Transport Infrastructure (12 per cent)
241.73−4.23192184072Transport Infrastructure (12 per cent)
251.73−4.23192183072Transport Infrastructure (12 per cent)
29A poor simulation (10th percentile)1.72−4.24192184072Transport Infrastructure (12 per cent)
151.72−4.24192184072Transport Infrastructure (12 per cent)
121.72−4.24192184072Transport Infrastructure (12 per cent)
281.71−4.25192184072Transport Infrastructure (12 per cent)