Simulations
All 30 simulations of Czechia, scripted, 30 years from 1996, one per seed, at 2026. The representative simulations link to their own pages, told round by round.
Model 0.2.0 · graph 0.2.0 · parameters 0.1.1 · The experiment
Every simulation
One row per seed, at the horizon. Select a heading to sort.
Simulation | Index | Change | Rank | Tier rank | Tier 1 | Shocks | Upsides | Most funded group |
|---|---|---|---|---|---|---|---|---|
| 12 | 11.62 | −0.27 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (19 per cent) |
| 20 | 11.62 | −0.27 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (19 per cent) |
| 17 | 11.62 | −0.27 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (19 per cent) |
| 21A good simulation (90th percentile) | 11.62 | −0.27 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (19 per cent) |
| 13 | 11.62 | −0.28 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (19 per cent) |
| 26 | 11.62 | −0.28 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (19 per cent) |
| 11 | 11.61 | −0.28 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (19 per cent) |
| 18 | 11.61 | −0.28 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (19 per cent) |
| 27 | 11.61 | −0.28 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (19 per cent) |
| 5 | 11.61 | −0.28 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (19 per cent) |
| 19 | 11.61 | −0.28 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (19 per cent) |
| 6 | 11.61 | −0.28 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (19 per cent) |
| 30 | 11.61 | −0.28 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (19 per cent) |
| 2Median simulation | 11.61 | −0.28 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (19 per cent) |
| 29 | 11.61 | −0.28 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (19 per cent) |
| 4 | 11.61 | −0.28 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (19 per cent) |
| 14 | 11.61 | −0.28 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (19 per cent) |
| 25 | 11.61 | −0.29 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (18 per cent) |
| 23 | 11.60 | −0.29 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (19 per cent) |
| 9 | 11.60 | −0.29 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (19 per cent) |
| 15 | 11.60 | −0.29 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (19 per cent) |
| 3 | 11.60 | −0.29 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (19 per cent) |
| 22 | 11.60 | −0.29 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (19 per cent) |
| 7 | 11.60 | −0.29 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (19 per cent) |
| 28 | 11.60 | −0.29 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (19 per cent) |
| 8 | 11.59 | −0.30 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (19 per cent) |
| 16 | 11.59 | −0.30 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (19 per cent) |
| 24A poor simulation (10th percentile) | 11.59 | −0.30 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (19 per cent) |
| 10 | 11.59 | −0.30 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (19 per cent) |
| 1 | 11.59 | −0.31 | 32 | 5 | 3 | 6 | 1 | Transport Infrastructure (19 per cent) |