Simulations
All 30 simulations of Ethiopia, scripted, 30 years from 1996, one per seed, at 2026. The representative simulations link to their own pages, told round by round.
Model 0.2.0 · graph 0.2.0 · parameters 0.1.1 · The experiment
Every simulation
One row per seed, at the horizon. Select a heading to sort.
Simulation | Index | Change | Rank | Tier rank | Tier 1 | Shocks | Upsides | Most funded group |
|---|---|---|---|---|---|---|---|---|
| 18 | 4.32 | −1.64 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |
| 22 | 4.32 | −1.64 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |
| 26 | 4.32 | −1.64 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |
| 5A good simulation (90th percentile) | 4.32 | −1.65 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |
| 1 | 4.31 | −1.65 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |
| 17 | 4.31 | −1.65 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |
| 20 | 4.31 | −1.65 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |
| 9 | 4.31 | −1.65 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |
| 13 | 4.31 | −1.65 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |
| 27 | 4.31 | −1.65 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |
| 11 | 4.31 | −1.65 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |
| 23 | 4.31 | −1.65 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |
| 6 | 4.31 | −1.65 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |
| 30 | 4.31 | −1.65 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |
| 3Median simulation | 4.31 | −1.65 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |
| 12 | 4.31 | −1.65 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |
| 24 | 4.31 | −1.65 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |
| 2 | 4.31 | −1.65 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |
| 14 | 4.31 | −1.65 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |
| 21 | 4.31 | −1.65 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |
| 16 | 4.30 | −1.66 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |
| 4 | 4.30 | −1.66 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |
| 10 | 4.30 | −1.66 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |
| 7 | 4.30 | −1.66 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |
| 8 | 4.30 | −1.66 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |
| 19 | 4.30 | −1.66 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |
| 29A poor simulation (10th percentile) | 4.30 | −1.66 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |
| 25 | 4.30 | −1.66 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |
| 28 | 4.30 | −1.66 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |
| 15 | 4.29 | −1.67 | 135 | 114 | 0 | 7 | 2 | Transport Infrastructure (12 per cent) |