E4 · cycle-003.e4-eth

Simulations

All 30 simulations of Ethiopia, scripted, 30 years from 1996, one per seed, at 2026. The representative simulations link to their own pages, told round by round.

Model 0.2.0 · graph 0.2.0 · parameters 0.1.1 · The experiment

Every simulation

One row per seed, at the horizon. Select a heading to sort.

Simulation
Index
Change
Rank
Tier rank
Tier 1
Shocks
Upsides
Most funded group
184.32−1.64135114072Transport Infrastructure (12 per cent)
224.32−1.64135114072Transport Infrastructure (12 per cent)
264.32−1.64135114072Transport Infrastructure (12 per cent)
5A good simulation (90th percentile)4.32−1.65135114072Transport Infrastructure (12 per cent)
14.31−1.65135114072Transport Infrastructure (12 per cent)
174.31−1.65135114072Transport Infrastructure (12 per cent)
204.31−1.65135114072Transport Infrastructure (12 per cent)
94.31−1.65135114072Transport Infrastructure (12 per cent)
134.31−1.65135114072Transport Infrastructure (12 per cent)
274.31−1.65135114072Transport Infrastructure (12 per cent)
114.31−1.65135114072Transport Infrastructure (12 per cent)
234.31−1.65135114072Transport Infrastructure (12 per cent)
64.31−1.65135114072Transport Infrastructure (12 per cent)
304.31−1.65135114072Transport Infrastructure (12 per cent)
3Median simulation4.31−1.65135114072Transport Infrastructure (12 per cent)
124.31−1.65135114072Transport Infrastructure (12 per cent)
244.31−1.65135114072Transport Infrastructure (12 per cent)
24.31−1.65135114072Transport Infrastructure (12 per cent)
144.31−1.65135114072Transport Infrastructure (12 per cent)
214.31−1.65135114072Transport Infrastructure (12 per cent)
164.30−1.66135114072Transport Infrastructure (12 per cent)
44.30−1.66135114072Transport Infrastructure (12 per cent)
104.30−1.66135114072Transport Infrastructure (12 per cent)
74.30−1.66135114072Transport Infrastructure (12 per cent)
84.30−1.66135114072Transport Infrastructure (12 per cent)
194.30−1.66135114072Transport Infrastructure (12 per cent)
29A poor simulation (10th percentile)4.30−1.66135114072Transport Infrastructure (12 per cent)
254.30−1.66135114072Transport Infrastructure (12 per cent)
284.30−1.66135114072Transport Infrastructure (12 per cent)
154.29−1.67135114072Transport Infrastructure (12 per cent)