Round 29 · simulation 20 · cycle-003.e4-ukr

Round 2025

Round 29 of 30 in simulation 20 of Ukraine, scripted, 30 years from 1996: 5 actions, and the index +0.017 to 6.88.

Model 0.2.0 · graph 0.2.0 · parameters 0.1.1

State in and state out

The simulation as it came into 2025 (the end of 2024) and as it left it.

Capability index
6.88 (+0.017)
In: 6.86
Rank by index
83
In: 83
Domains at Tier 1
0
In: 0
Credits carried
225
In: 224
Each domain's mean score and tier coming in and going out
DomainInOutChangeTier
Critical Technology6.686.66−0.0256
Strategic Infrastructure8.288.23−0.0536
National Security7.918.10+0.1985
Human Capital10.2710.26−0.0039
Information & Influence5.155.14−0.00913
Governance & Integrity7.667.75+0.09413
Financial Strength4.464.47+0.01328
Production & Innovation5.835.80−0.03215
Trade & Investment5.525.48−0.03313

Decision, shocks and propagation

What happened in 2025: the credits, the scripted method's decision and its actions, any shocks and upside events, the tier changes, and the groups that moved most, split into what was invested, lost to decay, struck by events and carried through the dependency graph.

Credits. Income 217, plus 224 carried in. Maintenance 161. Spent 56 on actions (partner 56). 225 carried over.

  • PartnerLand Power11 credits for 0.42 levelsscripted_history
  • PartnerAir Power11 credits for 0.59 levelsscripted_history
  • PartnerCyber & Electromagnetic Operations11 credits for 0.68 levelsscripted_history
  • PartnerJoint Command, Projection & Sustainment11 credits for 0.63 levelsscripted_history
  • PartnerNational Resilience & Crisis Management11 credits for 0.58 levelsscripted_history

Earlier events still landing: +0.8 points this round.

The groups that moved most in 2025, and what moved them
Moved mostChangeInvestedDecayEventsGraph
Cyber & Electromagnetic Operations+0.70+0.730.000.00−0.04
National Resilience & Crisis Management+0.63+0.620.00+0.01−0.01
Joint Command, Projection & Sustainment+0.63+0.670.000.00−0.05
Air Power+0.57+0.640.000.00−0.07
Land Power+0.37+0.450.000.00−0.08
Advanced Manufacturing−0.110.000.00+0.01−0.12